New Orleans Subdivision Regulations
Regulations to guide the future growth and development of the City in accordance with the Master Plan
Printed: 1/14/2025 5:41:28 PM
3.2.10 Engineering Plan Approval (Major Subdivision, New Streets)
Once the Preliminary Subdivision Plan has been approved by the City Planning Commission, the applicant can prepare engineering plans for the required infrastructure associated with the subdivision, including but not limited to streets, sidewalks, water, sewer, drainage, stormwater management, etc. These plans shall be prepared to the specifications of the relevant regulating agencies. These plans shall be approved by the Department of Public Works, the Sewerage and Water Board, the Department of Safety and Permits (if stormwater management is required), and any other applicable agency that has jurisdiction over the required infrastructure improvements. Once the plans have been approved by the applicable agencies, the plans shall be submitted to the City Planning Commission for the signature of the Executive Director. Once approved by the City Planning Commission, the approved engineering plans shall be provided to the applicant and the applicable reviewing agencies.